What to Include When You Request Safety Personnel

How to scope safety staffing: a practical checklist for requesting contract safety managers, site safety officers or SSHOs.

When a project needs safety coverage, the request itself often decides how quickly the right person reaches the site. A vague request — “we need a safety guy next week” — leads to back-and-forth, mismatched candidates and lost time. A complete request lets a staffing partner match qualifications on the first pass.

Use this checklist before you send a safety personnel request to any provider.

1. The project

  • Project type: data center, industrial, commercial, infrastructure, refinery turnaround, federal project.
  • Location: city and state, and whether the site is remote.
  • Phase of work: sitework, structure, MEP, commissioning, shutdown.
  • Workforce size: current and expected peak craft headcount.
  • High-risk activities: crane lifts, excavation, confined space, hot work, energized electrical work, work at height.

2. The position

  • Title and level: Safety Manager, Site Safety Officer, Safety Coordinator, SSHO.
  • Number of positions and who each one reports to.
  • Responsibilities: inspections, JHA/AHA review, permits, orientations, incident investigation, reporting.

3. Required qualifications

Check your prime contract and the owner’s safety program — requirements are often written there, not in the project manager’s head.

  • Professional certifications (for example CHST, CSP, ASP or SMS).
  • OSHA 30-Hour, OSHA 510 or other required training.
  • EM 385-1-1 training and minimum experience for federal SSHO roles.
  • Site access requirements: TWIC, drug and background screening, First Aid/CPR, client-specific orientations.
Tip: Share the exact contract language for safety staffing. It prevents a candidate being rejected at the gate for a credential nobody mentioned.

4. Schedule

  • Mobilization date and expected duration.
  • Shift pattern (for example 5×10s or 6×10s), and whether nights or weekends are required.
  • Any planned surge periods, such as a turnaround window.

5. Commercial details

  • How the work will be contracted: subcontract, purchase order or consulting agreement.
  • Per diem or travel requirements for out-of-area personnel.
  • Who approves time and who receives safety reports.

Send it once, completely

A request that answers these questions can usually be scoped in one conversation. If you are ready, send your request to Fidelity Safety Group or email scopes and bid documents to [email protected].